BEFORE

AFTER

Before worktop installation



Installation of new floor joists

Removal of rotten floor joists




Plastered & new spotlights









BEFORE

AFTER





BEFORE




BEFORE

AFTER









Simple and stylish ready for all new tenants once decorative works have been completed.

BEFORE - Existing Kitchen & Flooring

AFTER

AFTER

DURING - Existing Kitchen & Flooring Removed

DURING - New Laminate Flooring installed complete with sound deadening underlay (Second Floor Flat)

DURING

DURING

DURING




AFTER
Our client required a 5 day turnaround for this tenanted flat, all completed on time to our usual high standards - even with a few supplier errors!

BEFORE

DURING

AFTER


AFTER

BEFORE

DURING

AFTER



AFTER












BEFORE

BEFORE

DURING - Full rip out

DURING

DURING - Unit installation

DURING - Worktop Installation

DURING

AFTER

AFTER - Floor tiling to be completed by another contractor

BEFORE - Kitchen

BEFORE - Kitchen

DURING - Complete rip out

DURING

DURING - Kitchen with new laminate flooring

BEFORE - Dining area

DURING - Plumbing works

DURING - Near completion

AFTER - Dining area

WORKTOP JOIN

BEFORE

AFTER

BEFORE

BEFORE

MID INSTALLATION

AFTER

AFTER